Public testnetc12-testnet-1Launch target: public testnet for investor diligence (no mainnet, no public token sale). C12 is protocol collateral and gas, not equity.
CEC semiannual filing · due 31 July 2027
One site, three readers
The chain stores who signed which quantities and this packet's hash. That is not a finding that a charger dispensed electricity or that an uptime percentage is physically true. Public testnet checking windows are shorter on devnet than the 60-day testnet target.
This walkthrough is for education and oversight reading. It is not a government filing portal. Hashes and signed worksheets are evidence the parties recorded, not agency submissions.
Investor walkthrough
Investor diligence demo: public testnet target 15 Jan 2027, first close target 31 Jan 2027, Zevo as reference writer for EV charging and Scope 3 business travel records. This page walks H1 2027 California charging oversight reading — not a government filing.
Zevo is a related-party reference writer on public testnet (p:zevo-integrator, p:zevo-host). Records from configured related-party participant ids show a badge. Independence rules still apply on chain.
Network
Public testnetc12-testnet-1
Indexed height
101102026-10-31 03:22:37.478Z
Telemetry hash
Mismatchsha256:00a…b4988a05
Auditor view
Period roll-upsMerkle proofs when aggregate module is live
Browse finalized period roll-ups, open each record, and verify Merkle inclusion proofs against the on-chain root. This read path supports Scope 3 and sustainability evidence review. It does not certify meter truth or file with a regulator.
Operator
Devnet seats keep their genesis names. p:labs-ops-1 signs as station operator, p:labs-integrator is the network provider and minter, p:labs-utility signs the meter, p:labs-verifier posts the check, and p:labs-regulator is the state reader.
a:site-ca-1 for January–June 2027 is two facts. A half-year is longer than the 92-day chain window. Q1 energy is outside the meter band. Q2 energy is inside it.
20 CCR 3124(b); PRC 25231.5. Due 2027-07-31. Formula (T - (D - E)) / T. H1 T = 260,640 minutes.
Uptime on this page is recomputed from the operator's worksheet with U = (T - (D - E)) / T.
Port
PORT-A
Downtime D
6,000 min
Excluded E
2,000 min
H1 uptime
98.46%
At or above 97% on this half-year worksheet
Port
PORT-B
Downtime D
20,000 min
Excluded E
1,000 min
H1 uptime
92.71%
Below 97% on this half-year worksheet
A figure below 97% is the operator’s signed worksheet, recomputed here. The chain did not rule on the minutes.
Annual 97% test: incomplete. H2 2027 is unreported. The annual 97 percent test uses T = 525,600 minutes. H2 2027 is not in this packet, so the annual rate is not computed.
State · CARB LCFS
LCFS_CA is a CARB credit record on cleared energy. It is not the CEC uptime filing.
Purpose
LCFS_CA
Quarter
2027-Q2
Claim
Not recorded
J state
—
Federal
The same worksheet is the NEVI-shaped uptime read under 23 CFR 680.116. H2 2027 is absent, so the annual 97 percent test is not computed. Nothing on this page is sent to FHWA or EV-CHART.
Sample of the 15-minute reliability rows the operator retains. This is not six months of OCPP traffic.