Public testnetc12-testnet-1Public testnet. Testnet tokens have no monetary value. There is no mainnet yet. C12 is the network's utility token, not equity and not the settlement currency. Settlement is designed to be in USD stablecoins; testnet deposits still use test C12.
Claims

Claims by category

Signed records of real-world environmental data: energy, transport, emissions, water, soil and air. Pick a category to read each claim in plain words, see who reported it, and how far it has been checked.

Records on this page are what the chain stored. They are not a finding that a meter reading or a trip was true. Totals count each event once: an independent meter reading is shown as evidence on the site's record and is not added again. Records marked simulated come from the Carbon12 agent simulation (fictional actors), not real sites.

EnergySimulated data
6,372 kWh
191 sessions at 2 sites
191 of 191 matched by an independent meter · 84 used for a program claim
Latest record ends 6 Nov 2026, 3:54 PM UTC
E1
Transport and EV ridesSimulated data
—
85 trips · 453.8 kg CO2e recorded
Latest record ends 6 Nov 2026, 3:33 PM UTC
E1
EmissionsSimulated data
697.91 tCO2e
57 records from 1 site
Latest record ends 6 Nov 2026, 4:03 PM UTC
E1
WaterSimulated data
7,065 m3
57 readings at 1 site
Latest record ends 6 Nov 2026, 3:48 PM UTC
E3
Soil and landSimulated data
3.0% organic carbon
average of 57 samples at 1 site
Latest record ends 6 Nov 2026, 3:23 PM UTC
E4
Air qualitySimulated data
PM2.5 21 ug/m3
average of 57 readings at 1 site
Latest record ends 6 Nov 2026, 3:58 PM UTC
E2
Waste and materialsSimulated data
460.78 t
56 records from 1 site
Latest record ends 6 Nov 2026, 3:13 PM UTC
E5
BiodiversitySimulated data
460.26 ha
28 surveys at 1 site
Latest record ends 6 Nov 2026, 2:18 PM UTC
E4

Energy: recent claimsSimulated

Electricity and fuel delivered or used, in kWh. Reporting frameworks (informational, not assurance): GHG Protocol — Scope 2 input, or Scope 3 for energy sold (reporter-dependent); ESRS — E1 (energy use and mix).

  1. Golden State Charge Co (simulation) delivered 19.2 kWh to electric vehicles at GSC-CA-LAX-02 (Los Angeles area) on 1 Nov 2026, 1:09 AM UTC. An independent meter (FLEET-EV-METER-B) read 19.3 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Used: LCFS_CA
    Evidence tier 2SimulatedDetails
  2. Golden State Charge Co (simulation) delivered 54.5 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 1 Nov 2026, 12:24 AM UTC. An independent meter (FLEET-EV-METER-A) read 54.3 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Available to claim
    Evidence tier 2SimulatedDetails
  3. Golden State Charge Co (simulation) delivered 54.8 kWh to electric vehicles at GSC-CA-LAX-02 (Los Angeles area) on 31 Oct 2026, 11:39 PM UTC. An independent meter (FLEET-EV-METER-B) read 54.7 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Used: LCFS_CA
    Evidence tier 2SimulatedDetails
  4. Golden State Charge Co (simulation) delivered 25.5 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 11:21 PM UTC. An independent meter (FLEET-EV-METER-A) read 25 kWh. This record was corrected after a challenge.
    • Submitted
    • Evidencetier 2
    • Corrected (rev 1)challenge settled
    • Rolled up
    • Not yet used
    Evidence tier 2SimulatedDetails
  5. Golden State Charge Co (simulation) delivered 54.7 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 10:54 PM UTC. An independent meter (FLEET-EV-METER-A) read 54.7 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Available to claim
    Evidence tier 2SimulatedDetails
  6. Golden State Charge Co (simulation) delivered 14.6 kWh to electric vehicles at GSC-CA-LAX-02 (Los Angeles area) on 31 Oct 2026, 10:09 PM UTC. An independent meter (FLEET-EV-METER-B) read 14.6 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Available to claim
    Evidence tier 2SimulatedDetails
  7. Golden State Charge Co (simulation) delivered 37.4 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 9:24 PM UTC. An independent meter (FLEET-EV-METER-A) read 37.5 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Available to claim
    Evidence tier 2SimulatedDetails
  8. Golden State Charge Co (simulation) delivered 26.9 kWh to electric vehicles at GSC-CA-LAX-02 (Los Angeles area) on 31 Oct 2026, 8:39 PM UTC. An independent meter (FLEET-EV-METER-B) read 26.9 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Used: LCFS_CA
    Evidence tier 2SimulatedDetails
  9. Golden State Charge Co (simulation) delivered 11.7 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 7:54 PM UTC. An independent meter (FLEET-EV-METER-A) read 11.7 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Available to claim
    Evidence tier 2SimulatedDetails
  10. Golden State Charge Co (simulation) delivered 14.1 kWh to electric vehicles at GSC-CA-LAX-02 (Los Angeles area) on 31 Oct 2026, 7:09 PM UTC. An independent meter (FLEET-EV-METER-B) read 14.1 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Used: LCFS_CA
    Evidence tier 2SimulatedDetails
  11. Golden State Charge Co (simulation) delivered 54.4 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 6:24 PM UTC. An independent meter (FLEET-EV-METER-A) read 52.9 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Available to claim
    Evidence tier 2SimulatedDetails
  12. Golden State Charge Co (simulation) delivered 37 kWh to electric vehicles at GSC-CA-LAX-02 (Los Angeles area) on 31 Oct 2026, 5:39 PM UTC. An independent meter (FLEET-EV-METER-B) read 36.9 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Used: LCFS_CA
    Evidence tier 2SimulatedDetails
  13. Golden State Charge Co (simulation) delivered 23.4 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 4:54 PM UTC. An independent meter (FLEET-EV-METER-A) read 23.4 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Used: LCFS_CA
    Evidence tier 2SimulatedDetails
  14. Golden State Charge Co (simulation) delivered 28.8 kWh to electric vehicles at GSC-CA-LAX-02 (Los Angeles area) on 31 Oct 2026, 4:09 PM UTC. An independent meter (FLEET-EV-METER-B) read 28.8 kWh. This record was corrected after a challenge.
    • Submitted
    • Evidencetier 2
    • Corrected (rev 1)challenge settled
    • Rolled up
    • Not yet used
    Evidence tier 2SimulatedDetails
  15. Golden State Charge Co (simulation) delivered 46.4 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 3:24 PM UTC. An independent meter (FLEET-EV-METER-A) read 46.3 kWh.
    • Submitted
    • Evidencetier 2
    • Checked
    • Rolled up
    • Available to claim
    Evidence tier 2SimulatedDetails
  16. Golden State Charge Co (simulation) delivered 25 kWh to electric vehicles at GSC-CA-SFO-01 (San Francisco Bay Area) on 31 Oct 2026, 7:43 AM UTC. An independent meter (FLEET-EV-METER-A) read 25 kWh. This record was corrected after a challenge.
    • Submitted
    • Evidencetier 2
    • Corrected (rev 1)challenge settled
    • Rolled up
    • Not yet used
    Evidence tier 2SimulatedDetails